e-LocX Boards being made 2 at a time on a panel. These are at the second inspection conveyor.
Automated robotic assembly equipment.
Phase I of the assembly process is complete when the boards come out of the SMT oven. They will then go on to second inspection, through hole part insertion and other processes.
500 N 56th Street: Suite 15
Chandler Arizona 85226
602-437-8005
800-591-6989
CustomerCare@Global-Electronics.com
Copyright 1995-2010 Global Electronics, Ltd. All Rights Reserved.